Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Floating engineered hardwood floor over concrete.
The planks glue together to create a floor that floats moves freely as a unit.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Start installing pieces on a long straight wall.
You have two basement wood flooring options solid hardwood or engineered.
There are some key differences in engineered wood vs.
You may not need to build a plywood subfloor on top of the concrete slab depending on the floor system you choose.
When installing an engineered wood floor there are a few things to consider from the condition of the subfloor to the method that you will use to install the flooring.
Even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
You will trim it off at the height of the baseboard once the flooring has.
A smooth expanse of wood flooring adds warmth and anchors a room.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Basement wood flooring options.
Installing floors is a difficult diy job.
Check the drying time for your.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
Here are the basics of how to install floating hardwood floors over concrete.
Engineered flooring goes down over a thin foam sheet which provides cushioning and sound dampening.
Installing a hardwood floor over a concrete slab.
The easiest way to install hardwood is a floating floor.
Floating wood flooring can provide you with a simple installation and a beautiful floor at the same time.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
If installing the floor over concrete lay 1 4 6mm plastic sheeting over the concrete and overlap the seams by at least 8 20cm.
You need to leave a 5 16 inch gap between the flooring and the baseboard or wall around the perimeter of the room to allow the floor enough space to expand.
Using a v notched trowel spread adhesive over a section of the floor.
How to install floating engineered hardwood floor.
Most people can install this type of hardwood flooring as long as they are willing to do a little bit of work.
Your very first step before installing engineered hardwood floors over concrete is to let the boards acclimate to the room where they re going to be installed.