Place a mark on the floor with a pencil on opposite ends of your starting wall.
Floating floor over osb.
Be careful not to pin the flooring down in the process.
Laminate flooring is indoor flooring for controlled environments.
From a distance osb flooring may look a little rough and uneven but when you get closer and feel the surface you realize that s just an optical illusion.
Outdoor floors porches patios or decking of any kind.
Osb oriented strand board.
Oriented strand board is sometimes used as a subfloor in construction.
Osb when exposed to the weather will eventually swell and bubble up.
Finish the molding to match the trim not the flooring.
Floating engineered wood floors can simply be installed directly on osb subfloor the hardwood flooring must be installed crossing the floor joists at a 90 degree angle.
Not only is the chip board appearance unattractive but the surface is also often marked with grid lines and manufacturer markings.
Osb is not attractive enough to serve as a floor covering.
The nwfa specifies that the subfloor must be level so.
Get 5 off when you sign up for emails with savings and tips.
Please enter in your email address in the following format.
Minor instances of bubbling can be sanded but for the most part the osb is irreparable and should be replaced.
A plywood subfloor generally uses 1 2 inch to 3 4 inch thick sheets of plywood that have one rough side which faces down and one smooth side which faces up.
As with all subfloors it must meet laminate flooring specifications.
Once your flooring is down install shoe molding to cover the expansion gap between the flooring and the base trim.
There s absolutely no problem laying a laminate floor over osb provided you take all the moisture preventative steps you would take for a plywood subfloor.
The sheets are generally 4 x 8 or 4 x 12 feet in size.
Snap a chalk line between the two marks giving you a parallel chalk line with the starting wall.
If there is any deflection in the subfloor when walked on it would be advisable to add an additional layer of 3 8 or 1 2 thick plywood underlayment glued and screwed down over the osb subfloor to add stability.
Shoot 1 1 4 inch finish nails through the shoe and into the base trim.