Adjustable cleanout assembly is installed with nickel bronze frame and secured cover flush with concrete slab fig.
Floor cleanout access.
3 x 4 44 32.
Aco 701r adjustable cleanout with 5 1 2 nickel cover round fits inside 4 hub view dimensions.
Product replaced with z1140.
General purpose cleanout access with 5 nickel cover fits inside 4 sch 40 pipe and over 3 sch 40 pipe view dimensions.
Carpeted floor cleanouts suffix x carpet clamping frame 4020 4025 and 4031 series only.
Get it as.
Access covers boxes.
Drain cleanouts tees access covers doors jay r.
Zurn co2450 pv4 adjustable floor cleanout 4 inch pvc hub connection brass.
Cleanouts access covers.
Zurn co2530 ss7 7 inch round stainless steel access cover with securing screw.
6000 floor grade cleanout.
Carpet is cut to fit.
8000 floor grade cleanout.
No more leaking or seized cleanout plugs our exclusive gas tight gasketed brass plugs hold for testing and are easily removed and replaced.
Floor drains channels trench watts cleanouts create an access point for piping inspection and maintenance.
8050 floor grade cleanout.
Cleanouts in under floor piping shall be extended to or above the finished floor or shall be extended outside the building when there is less than eighteen 18 inches 457 mm vertical overall allowing for obstructions such as ducts beams and piping and thirty 30 inches of 762 mm horizontal clearance from the means of access to such.
This serves as a func tional safe flush with floor cleanout during period prior to carpet installation.
A cleanout may be easily accessible in buildings that have a crawlspace or a basement.
Aco 701rs adjustable cleanout with 5 1 2 nickel cover square fits inside 4 hub.
Discontinued the zurn z1444 floor cleanout with dura coated cast iron body gas and watertight abs tapered thread plug and a polished scoriated secured nickel bronze access cover and frame.
Free shipping on your first order shipped by amazon.
Z1444 floor cleanout with round access cover.
Cleanout access cover selection guide.
A cleanout located inside the building may be inside a wall or floor.
4 3 out of 5 stars 63.
Floor cleanout food beverage food preparation garden areas general purpose institutions hospitals schools office buildings.
Get it as soon as fri oct 9.